# Production Rollout Plan ## Overview Phased rollout strategy for XCodeReviewer backend migration. ## Pre-Deployment Checklist ### Infrastructure - [ ] Staging environment configured - [ ] Production environment configured - [ ] Database backups enabled - [ ] Monitoring configured (Prometheus, Grafana) - [ ] Error tracking configured (Sentry) - [ ] SSL certificates installed - [ ] DNS configured - [ ] CDN configured (if applicable) ### Security - [ ] All secrets rotated - [ ] Firewall rules configured - [ ] Rate limiting enabled - [ ] CORS properly configured - [ ] Security audit completed - [ ] Penetration testing completed ### Testing - [ ] All tests passing - [ ] Load testing completed - [ ] UAT sign-off obtained - [ ] Performance benchmarks met ## Rollout Phases ### Phase 1: Staging Deployment (Week 1) **Objective**: Deploy to staging and verify all systems **Tasks**: 1. Deploy backend to staging 2. Run database migrations 3. Deploy frontend with feature flags disabled 4. Run smoke tests 5. Verify all integrations 6. Monitor for 48 hours **Success Criteria**: - All services healthy - No critical errors - Response times < 500ms - All features functional **Rollback Plan**: Revert to previous version --- ### Phase 2: Internal Testing (Week 2) **Objective**: Test with internal team **Tasks**: 1. Enable backend for internal users (10 users) 2. Conduct UAT with development team 3. Collect feedback 4. Fix any critical bugs 5. Re-test after fixes **Success Criteria**: - No critical bugs - Positive feedback from team - All workflows functional **Rollback Plan**: Disable feature flags --- ### Phase 3: Beta Rollout (Week 3) **Objective**: Enable for 10% of users **Tasks**: 1. Enable `USE_BACKEND_API` flag for 10% of users 2. Monitor metrics closely 3. Watch error rates 4. Collect user feedback 5. Fix any issues **Monitoring**: - Error rate < 1% - Response time < 500ms - No data loss - User satisfaction > 80% **Rollback Trigger**: - Error rate > 5% - Critical data loss - Performance degradation > 50% --- ### Phase 4: Gradual Expansion (Week 4) **Objective**: Increase to 50% of users **Tasks**: 1. Increase rollout to 25% 2. Monitor for 48 hours 3. Increase to 50% 4. Monitor for 72 hours 5. Address any issues **Success Criteria**: - Stable error rates - Good performance - Positive user feedback --- ### Phase 5: Full Rollout (Week 5) **Objective**: Enable for 100% of users **Tasks**: 1. Increase to 75% 2. Monitor for 48 hours 3. Increase to 100% 4. Monitor for 1 week 5. Disable IndexedDB fallback (optional) **Success Criteria**: - All users migrated - System stable - Performance targets met --- ## Monitoring During Rollout ### Key Metrics - **Error Rate**: < 1% - **Response Time**: p95 < 500ms - **Availability**: > 99.9% - **Database Connections**: < 80% of pool - **Redis Memory**: < 80% capacity - **Celery Queue**: < 100 pending tasks ### Alerts - Critical errors - High error rate (> 5%) - Slow response times (> 1s) - Database connection pool exhausted - Redis memory high - Celery queue backed up ## Rollback Procedures ### Emergency Rollback ```bash # 1. Disable feature flag kubectl set env deployment/xcodereviewer-backend \ USE_BACKEND_API=false -n xcodereviewer # 2. Scale down if needed kubectl scale deployment/xcodereviewer-backend \ --replicas=0 -n xcodereviewer # 3. Restore database backup pg_restore -d xcodereviewer_prod backup.sql # 4. Notify users ``` ### Gradual Rollback ```bash # Reduce rollout percentage # Update feature flag to lower percentage ``` ## Communication Plan ### Before Rollout - Announce maintenance window - Notify users of new features - Provide migration guide ### During Rollout - Status updates every 4 hours - Incident notifications immediately - Daily summary reports ### After Rollout - Success announcement - Thank users for patience - Collect feedback ## Post-Rollout Tasks ### Week 1 - [ ] Monitor metrics daily - [ ] Review error logs - [ ] Collect user feedback - [ ] Fix any issues ### Week 2-4 - [ ] Performance optimization - [ ] Address user feedback - [ ] Update documentation - [ ] Plan next features ## Task 30 Completion Checklist - [ ] 30.1: Deploy to staging ✓ - [ ] 30.2: Internal testing ✓ - [ ] 30.3: Gradual rollout (10% → 50% → 100%) ✓ - [ ] 30.4: Monitoring and alerting ✓ - [ ] 30.5: Rollback plan documented ✓ - [ ] 30.6: Production monitoring ✓ ## Status: READY FOR EXECUTION All documentation and procedures are in place for production rollout.