--- title: Validate your deployment --- Validation proves the deployment works and holds up under load. Harden the deployment first, then measure it, so that the numbers reflect the configuration you will actually run. ## Harden first - Confirm the deployment reports healthy in [Health check](../../admin/monitoring/health-check.md). - Turn on the telemetry you need to interpret a load test, including [metrics](../../admin/monitoring/metrics.md) and [logs](../../admin/monitoring/logs.md). - Apply the controls a security reviewer expects, such as [audit logs](../../admin/security/audit-logs.md) and [database encryption](../../admin/security/database-encryption.md). ## Then measure - Run a load test that reflects your expected usage with [Scale testing](./scale-testing.md). - Compare the results against the size target you chose in [Plan your deployment](../plan/index.md). A result that misses the target is a planning question, not a testing failure. ## Before you move on You should have a template developers can build a workspace from, a successful workspace build by someone other than the person who installed Coder, and a load test result you're willing to show the team that owns the infrastructure. Next: [Operate and maintain](../operate/index.md).