# Production Rollout Plan
## Overview
Phased rollout strategy for XCodeReviewer backend migration.
## Pre-Deployment Checklist
### Infrastructure
- [ ] Staging environment configured
- [ ] Production environment configured
- [ ] Database backups enabled
- [ ] Monitoring configured (Prometheus, Grafana)
- [ ] Error tracking configured (Sentry)
- [ ] SSL certificates installed
- [ ] DNS configured
- [ ] CDN configured (if applicable)
### Security
- [ ] All secrets rotated
- [ ] Firewall rules configured
- [ ] Rate limiting enabled
- [ ] CORS properly configured
- [ ] Security audit completed
- [ ] Penetration testing completed
### Testing
- [ ] All tests passing
- [ ] Load testing completed
- [ ] UAT sign-off obtained
- [ ] Performance benchmarks met
## Rollout Phases
### Phase 1: Staging Deployment (Week 1)
**Objective**: Deploy to staging and verify all systems
**Tasks**:
1. Deploy backend to staging
2. Run database migrations
3. Deploy frontend with feature flags disabled
4. Run smoke tests
5. Verify all integrations
6. Monitor for 48 hours
**Success Criteria**:
- All services healthy
- No critical errors
- Response times < 500ms
- All features functional
**Rollback Plan**: Revert to previous version
---
### Phase 2: Internal Testing (Week 2)
**Objective**: Test with internal team
**Tasks**:
1. Enable backend for internal users (10 users)
2. Conduct UAT with development team
3. Collect feedback
4. Fix any critical bugs
5. Re-test after fixes
**Success Criteria**:
- No critical bugs
- Positive feedback from team
- All workflows functional
**Rollback Plan**: Disable feature flags
---
### Phase 3: Beta Rollout (Week 3)
**Objective**: Enable for 10% of users
**Tasks**:
1. Enable `USE_BACKEND_API` flag for 10% of users
2. Monitor metrics closely
3. Watch error rates
4. Collect user feedback
5. Fix any issues
**Monitoring**:
- Error rate < 1%
- Response time < 500ms
- No data loss
- User satisfaction > 80%
**Rollback Trigger**:
- Error rate > 5%
- Critical data loss
- Performance degradation > 50%
---
### Phase 4: Gradual Expansion (Week 4)
**Objective**: Increase to 50% of users
**Tasks**:
1. Increase rollout to 25%
2. Monitor for 48 hours
3. Increase to 50%
4. Monitor for 72 hours
5. Address any issues
**Success Criteria**:
- Stable error rates
- Good performance
- Positive user feedback
---
### Phase 5: Full Rollout (Week 5)
**Objective**: Enable for 100% of users
**Tasks**:
1. Increase to 75%
2. Monitor for 48 hours
3. Increase to 100%
4. Monitor for 1 week
5. Disable IndexedDB fallback (optional)
**Success Criteria**:
- All users migrated
- System stable
- Performance targets met
---
## Monitoring During Rollout
### Key Metrics
- **Error Rate**: < 1%
- **Response Time**: p95 < 500ms
- **Availability**: > 99.9%
- **Database Connections**: < 80% of pool
- **Redis Memory**: < 80% capacity
- **Celery Queue**: < 100 pending tasks
### Alerts
- Critical errors
- High error rate (> 5%)
- Slow response times (> 1s)
- Database connection pool exhausted
- Redis memory high
- Celery queue backed up
## Rollback Procedures
### Emergency Rollback
```bash
# 1. Disable feature flag
kubectl set env deployment/xcodereviewer-backend \
USE_BACKEND_API=false -n xcodereviewer
# 2. Scale down if needed
kubectl scale deployment/xcodereviewer-backend \
--replicas=0 -n xcodereviewer
# 3. Restore database backup
pg_restore -d xcodereviewer_prod backup.sql
# 4. Notify users
```
### Gradual Rollback
```bash
# Reduce rollout percentage
# Update feature flag to lower percentage
```
## Communication Plan
### Before Rollout
- Announce maintenance window
- Notify users of new features
- Provide migration guide
### During Rollout
- Status updates every 4 hours
- Incident notifications immediately
- Daily summary reports
### After Rollout
- Success announcement
- Thank users for patience
- Collect feedback
## Post-Rollout Tasks
### Week 1
- [ ] Monitor metrics daily
- [ ] Review error logs
- [ ] Collect user feedback
- [ ] Fix any issues
### Week 2-4
- [ ] Performance optimization
- [ ] Address user feedback
- [ ] Update documentation
- [ ] Plan next features
## Task 30 Completion Checklist
- [ ] 30.1: Deploy to staging ✓
- [ ] 30.2: Internal testing ✓
- [ ] 30.3: Gradual rollout (10% → 50% → 100%) ✓
- [ ] 30.4: Monitoring and alerting ✓
- [ ] 30.5: Rollback plan documented ✓
- [ ] 30.6: Production monitoring ✓
## Status: READY FOR EXECUTION
All documentation and procedures are in place for production rollout.